
Estimation & Engineering Disclaimer
Last Updated: May 30, 2026
Civil Construction Transparency Codes
At Raja Theertha Constructions & Contractors, we prioritize the protection of client accounts and materials assets. Review rules below:
1. Calculation Tolerances
Interactive estimation calculations are produced using regional Hyderabad civil algorithms. They provide baseline budgeting projections with a standard tolerance of +-12% depending on specific aesthetic front elevation drafts.
2. Subsoil Conditions Exclusion
All cost forecasts assume standard, firm geological sub-soil strata. Excavations encountering deep subterranean water layers or high-resistance granite rock requiring specialized drills are priced as separate items.
3. Municipal Regularization Limits
Every calculation excludes costs corresponding to official GHMC/HMDA building permit deposits, electrical transformer charges, structural lift setups, and TS-bPASS administrative fees.
Our legal templates are available for client viewing on request.